First slide Previous slide    Index Page    Next slide Last slide

No EXIF Info   
A closer look at the southern/eastern end of the tunnel, September, 2001. Note skid marks, many of which cross the centerline. The problem was predictable, and AASHTO guidelines on curve radius, sightlines and design speed exist to prevent such problems.
Generated by JAlbum 7.4 / PositionMap 5.7.3
Photos and captions by John S. Allen
unless otherwise indicated.